So December is over and with it the year is drawing to a close already! As usual, December has been a busy month with all the Christmas preparation and baking etc but I am so glad I managed to fit in quite a lot of sewing after all, including a brand new quilt for our bed! Hoping for finish 1. Fair Isle quilt - top is pieced! - now need quilting - - this will be my choice for Decem ber for Elm Street Quilts One Monthly Goal - finished! 2. Open wide pouch - 6 done 3. Set of pouches with cat fabric - not done as the cat lover doesn't like cats anymore?? 4. C PE bag - done 5. A PE bag - done Bee Blocks 1. Flower hexies for the Inchy Hexie Swap (November. December ) - done 2. Bubble Bee (Novem ber ) - done 3. I love Lucy International (October, November, December) - October and December done, November in progress WIP 1. Wanta Fanta - need 1 more block 2. Elephant Parade - 6 more blo