Q2 FAL in review

Half of the year is gone and what a time it has been.... When I posted my Q2 FAL list, we had just started the lockdown, not knowing how long this was going to last. The lockdown is (slowly?) being lifted here and the new normal being established. In the meantime, I have also been told that I will lose my job in the next couple of weeks so of course I have been very busy looking for another one. All in all, although we have spent so much more time at home where I could probably have sewn a lot more, I have quite often lack the motivation or the energy to do just that... I guess this uncertainty is taking its toll on every one and we just have to accept that things are different and there is little visibility as to what direction we need to follow for now. I have had some productive streaks though and I did manage to progress a few projects but a lot of them will carry through my Q3 list.

Quilts:
1. Modern HST triangles - 1 block missing to have enough for a quilt top but very little background fabric - only one block left to do now - no progress
2. Project 48 quilt with a few Solstice challenge blocks (all blocks done, might need a few more???) - no progress
3. Farmer's Wife (not half way yet....)  - no progress
4. Farmer's Wife 1930 - only 24 blocks done - no progress
5. Gipsy Wife  - no progress
6. Enchanted Stars - no progress
7. Underground railway - most blocks available from years ago  - no progress
8. 365-challenge - so many blocks still needed! - no progress
9. Kingfisher quilt - a portable project, as long as I prepare before I go.... - no progress
10. Super Mario quilt - no progress
11.  Impromptu quilt - abandoned so long ago... I dream of having the quilt on my bed next summer... 
12. Scrappy strips quilt -  now quilted and only needs binding
13. Blue and purple quilt - no progress
14. Harry Potter quilt - no progress
15. Threadology quilt - now quilted and needs binding
16. Sewing studio banner - some progress, nearly all the blocks are pieced now
17. Baby quilt - no progress
18. Vintage kitchen quilt along - now quilted and needs binding
19. Blue sky top - finished!
20. Rainbow sky top - finished!
21. New York Beauty - no progress
22. Log Cabin Pyramids - no progress
23. Halo quilt - started
24. Mini series sew along - finished





Bags, accessories:
1. Power trip bag - no progress
2. Passport cover for me no progress
3. Rucksack no progress
4. Tote / maxi bag no progress
5. Hankiesno progress
6. Scrunchies
7. Wash bags for NHS - 25 made
8. Headbands for NHS no progress

Dressmaking:
1. Lander trousers - navy - no progress
2. Fumeterre skirt no progress
3. Shirt (button up) - puff blouse no progress
4. Kimono (dressing gown)- dusty pink no progress
5. Lola sweater dress grey no progress
6. Calvin dress - finished

7. Barkcloth dress - Belladone - half cut
8. Jersey dress - Moneta
9. Jasika Blazer - started to baste the lining
10. Jeans for myself - Morgan - cut and basted
11. Summer PJ for hubby no progress
12. Summer PJ for M no progress
13. PJ/nightdress for C - done
14. PJ/nightdress for A - done
15. PJ/nightdress for myself - done x 2

16. Sirocco jumpsuit - cut and started
17. Pilatus swimming costume - pattern cut
18. Cottesloe swimming costume no progress
19. Knickers - done
20. Comox trunk - done
21. Black beauty bra no progress
22. Ogden cami - finished but not fitting well so will be recycled in something else
23. Agate dress no progress
24. Voltaire top no progress
25. Puff blouse no progress
26. Shorts no progress
27. Ginger Jeans no progress
28. Belladonna - wearable toile no progress
29. Zadie jumpsuit no progress
30. Scrubs for NHS - 5 full sets completed


Cross-stitch
1. Grimm's Tales stitch along - little stitches
2. Rainbow - done

Celine

Comments

Popular posts from this blog

September in the Hexagon!

Dare to Dresden - Day 5

Blog hop and a giveaway