Q3 FAL in review

The Finish-Along is paused for the moment but if it was still running, it would be time to post Q3 makes. So I thought I would reflect on what I have finished from my long list in the last quarter, which has been such a roller-coaster, what with the self-isolation "holidays", finishing my job, starting a new home etc. I am happy that I am crossing a few of these projects off the list (don't worry though, I have plenty to add for next quarter!!)


Quilts:
1. Modern HST triangles - 1 block missing to have enough for a quilt top but very little background fabric - no progress 
2. Project 48 quilt with a few Solstice challenge blocks (all blocks done, might need a few more???) -  no progress 
3. Farmer's Wife (not half way yet....)  -  no progress 
4. Farmer's Wife 1930 - only 24 blocks done - no progress 
5. Gipsy Wife - no progress 
6. Enchanted Stars - no progress 
7. Underground railway - most blocks available from years ago - no progress 
8. 365-challenge - so many blocks still needed! - no progress 
9. Kingfisher quilt - a portable project, as long as I prepare before I go.... - no progress 
10. Super Mario quilt - I finally got this one and started working on it again...
11.  Impromptu quilt - abandoned so long ago.. no progress 
                                      
12. Scrappy strips quilt -  finished
13. Blue and purple quilt -
 no progress
 
14. Harry Potter quilt - no progress
15. Threadology quilt - still needs binding
16. Sewing studio banner - need a few more units before being put together - no progress 
17. Baby quilt - no progress 
18. Vintage kitchen quilt along - finished
19. New York Beauty - no progress  
20. Log Cabin Pyramids - no progress 
21. Halo quilt - little progress but still plenty to do...

Bags, accessories:
1. Power trip bag - not started 
2. Passport cover for me not started
3. Rucksack not started
4. Tote / maxi bag not started
5. Hankies not started
6. Scrunchies nearly done
7. School bag for A - swapped for 2 lunch bags
8. Face masks - done
9. Bo cover - finished

Dressmaking:
1. Lander trousers - navy - not started
2. Fumeterre skirt - cut - no progress
3. Shirt (button up) - not started
4. Kimono (dressing gown)- dusty pink - not started
5. Belladone wearable toile - nearly finished - no progress
6. Barkcloth dress - Belladone - no progress
7. Jersey dress - Monetano progress
8. Jasika Blazer - started to baste the lining - no progress
9. Ginger Jeans - not started
10. Morgan Jeans - cut - no progress
11. Summer PJ for hubby not started
12. Summer PJ for M not started
13. Nightdress for C - done
14. PJ/nightdress for myself - not started
15. Sirocco jumpsuit - finished
16. Pilatus swimming costume not started
17. Iris shorts not started
18. Knickers not started
19. Black beauty bra 
not started
20. Cami not started
21. Agate dress 
not started
22. Voltaire top not started
23. Zadie jumpsuit not started

Cross-stitch
1. Grimm's Tales stitch along - little progress

Celine

Comments

Popular posts from this blog

September in the Hexagon!

Blog hop and a giveaway

Ravenbrook Scrap Quilt Along